This project is to construct wastewater pipe in Pino Lane near E. William Cannon Dr. The new pipe will reroute flow from a manhole in Pino Lane south to another manhole in Dove Springs Road to alleviate the capacity bottleneck. The wastewater pipe near Pino Lane has a very high risk of overflows because the existing capacity is inadequate for current wastewater flows. The Work consists of installation of approximately 1,825 linear feet of new 6”, 8”, 15”, and 18” PVC wastewater line including bypass pumping, and new pre-cast and cast-in-place manholes. Additionally, the Work includes approximately 1,150 linear feet of Cured-In-Place Pipe (CIPP) lining on an existing 10” concrete wastewater line. Incidental work includes erosion and sedimentation control, pavement repair, stormwater pollution prevention plan (SWPPP), and traffic control during construction.
¿Calificás como pequeña empresa? El tope de facturación o empleados para el NAICS 423860 lo define la SBA y cambia con el tiempo — lo más seguro es confirmarlo ahí, no acá. Verificar en sba.gov ↗
Empresas que ganaron awards con este mismo NAICS — datos públicos de USAspending, no una recomendación ni un dato oficial.
Creá tu cuenta para ver documentos con resumen, punto de contacto, guardar esta oportunidad en tu pipeline y recibir alertas antes del cierre.
Crear cuenta gratisGovBidder Connect no es una agencia gubernamental. Esta información se agrega de fuentes oficiales de dominio público y puede tener demoras o errores. Verificá los datos en la fuente oficial antes de actuar.