In general, the work consists of, but is not limited to, construction work at 3 separate locations in the City of Monterey’s Monterey Vista and Alta Mesa Neighborhoods in the vicinity of San Bernabe Drive between Via Ventura and Bartolomea Way, Via Arboles and Munras Ave, and Don Dahvee Lane and Munras Ave. The San Bernabe Drive Road Widening and Sidewalk (NCP2522) project consists of demolition of existing concrete and asphalt roadway, grading and construction of retaining walls, curb, gutter, sidewalk and new storm drain connections, and associated grading, hot mix asphalt paving, storm drainage, and installation of new signage and roadway striping and pavement markings. The Munras Ave & Via Arboles Curb Ramp (NCP2504) project consists of demolition and construction of concrete curb, gutter, sidewalk, curb ramp, hot mix asphalt paving, and installation of new signage and roadway striping and pavement markings. The Don Dahvee Park Trail Crossing (NCP2421) project consists of the demolition and construction of concrete curb, gutter, concrete pavement, hot mix asphalt paving, and installation of new signage and roadway striping and pavement markings.
¿Calificás como pequeña empresa? El tope de facturación o empleados para el NAICS 237310 lo define la SBA y cambia con el tiempo — lo más seguro es confirmarlo ahí, no acá. Verificar en sba.gov ↗
Empresas que ganaron awards con este mismo NAICS — datos públicos de USAspending, no una recomendación ni un dato oficial.
Creá tu cuenta para ver documentos con resumen, punto de contacto, guardar esta oportunidad en tu pipeline y recibir alertas antes del cierre.
Crear cuenta gratisGovBidder Connect no es una agencia gubernamental. Esta información se agrega de fuentes oficiales de dominio público y puede tener demoras o errores. Verificá los datos en la fuente oficial antes de actuar.