Douglas L. Smith Middle Basin Asset Renewal Project

ACTIVE

The Work includes the furnishing of the labor, materials, equipment and services for construction of the new process area MB-17 Sodium Hypochlorite Storage and improvements made in the following existing buildings and site work improvements (yard piping, yard electrical, paving and grading, erosion control, and general restoration): MB-2 Solids Processing Building, MB-3 Gravity Thickener Building and Fermenter, MB-7 Administration Building, MB-8 Settled Sewage Pump Station, MB-10 Sodium Hypochlorite Building, MB-11 UV Disinfection Building, and MB-13 BNR Train No. 4 Primary Sludge Pump Station and Odor Control Building.    The work consists of the following:· The Work in MB-2 Solids Processing Building includes the replacement of grit classifiers and conveyors, demolition of an existing belt filter press, and structural beam and elevated slab repairs. The Work in MB-3 Gravity Thickener Building and Fermenter includes the replacement of a motor control center and various process valves.· The Work in MB-7 Administration Building includes the installation of a new natural gas powered standby generator and automatic transfer switch.· The Work in MB-8 Settled Sewage Pump Station includes primary sludge pump modifications and the replacement of the primary scum pumps, settled sewage pumps, and sidestream control valves.· The Work in MB-10 Sodium Hypochlorite Building includes the demolition of existing sodium hypochlorite storage tanks, piping, and pumps.· The Work in MB-11 UV Disinfection Building includes the relocation of an existing flow meter on the plant effluent water pumping system.· The Work in MB-13 BNR Train No. 4 Primary Sludge Pump Station and Odor Control Building includes the replacement of primary sludge pumps, odor control fans, building make-up air unit, and the electrical room air conditioning unit.· The Work associated with new process area MB-17 Sodium Hypochlorite Storage includes the construction of new sodium hypochlorite storage tanks and fill stations, an access roadway, and a pre-engineered fiberglass reinforced building. Within the pre-engineered building, new excess flow chemical metering pumps are to be installed along with the relocated plant effluent water chemical metering pump skid.  All questions and bids shall be submitted through IonWave.

N° de solicitud
Tipo de aviso
NAICS
237110 — Water and Sewer Line and Related Structures Construction
PSC
6640 — Laboratory Equipment And Supplies
Valor estimado (inferido, no oficial)
$63,804 – $3,979,485 (8 awards similares)
Set-aside
Lugar de ejecución
KS
Publicada
09 de jun de 2026
Cierre
02 de sept de 2026
Última actualización

¿Calificás como pequeña empresa? El tope de facturación o empleados para el NAICS 237110 lo define la SBA y cambia con el tiempo — lo más seguro es confirmarlo ahí, no acá. Verificar en sba.gov ↗

Posibles socios para subcontratar

Empresas que ganaron awards con este mismo NAICS — datos públicos de USAspending, no una recomendación ni un dato oficial.

Ver en la fuente oficial

Ver el detalle completo

Creá tu cuenta para ver documentos con resumen, punto de contacto, guardar esta oportunidad en tu pipeline y recibir alertas antes del cierre.

Crear cuenta gratis

GovBidder Connect no es una agencia gubernamental. Esta información se agrega de fuentes oficiales de dominio público y puede tener demoras o errores. Verificá los datos en la fuente oficial antes de actuar.