Datos de fuentes oficiales de EE.UU. · Ver planes y precios →
← Volver a la búsqueda

Franklin Boulevard Cycle Track Elk Grove Boulevard to Laguna Boulevard Project

ACTIVE

The proposed Work shall be performed in accordance with the plans, specifications and other Contract Documents and shall include but not be limited to the following: replacement of the existing Class II bike lane with one-way Class IV bikeways or cycle tracks on Franklin Boulevard between Elk Grove Boulevard and Laguna Boulevard. The Work includes installing a surface mounted concrete curb strip and mounting flexible delineators along the concrete curb strip (Work).

N° de solicitud
Tipo de aviso
NAICS
237310 — Highway, Street, and Bridge Construction
PSC
Y1LB — Construction Of Highways, Roads, Streets, Bridges, And Railways
Valor estimado (inferido, no oficial)
$1,184,350 – $50,000,000 (10 awards similares)
Set-aside
Lugar de ejecución
CA
Publicada
04 de ago de 2026
Cierre
15 de sept de 2026
Última actualización

¿Calificás como pequeña empresa? El tope de facturación o empleados para el NAICS 237310 lo define la SBA y cambia con el tiempo — lo más seguro es confirmarlo ahí, no acá. Verificar en sba.gov ↗

Posibles socios para subcontratar

Empresas que ganaron awards con este mismo NAICS — datos públicos de USAspending, no una recomendación ni un dato oficial.

Ver en la fuente oficial

Ver el detalle completo

Creá tu cuenta para ver documentos con resumen, punto de contacto, guardar esta oportunidad en tu pipeline y recibir alertas antes del cierre.

Crear cuenta gratis

GovBidder Connect no es una agencia gubernamental. Esta información se agrega de fuentes oficiales de dominio público y puede tener demoras o errores. Verificá los datos en la fuente oficial antes de actuar.