This project includes canopy work at three Cobb County School District locations, as outlined below: ¿ Cheatham Hill Elementary School: Demolish approximately 1,600 square feet of existing concrete sidewalk at the canopy extension area. Design and install a new canopy extending from the existing canopy along the drive aisle to the end of the school building; 2 different heights. The canopy will be approximately 245 feet long and 8 feet wide. Demolish and replace approximately 2,200 square feet of concrete at the front entrance and replace the existing flagpole. New curb and gutter required at all new sidewalk areas. ¿ East Side Elementary School: Base Bid- Install a new canopy at the main entrance, extending from the existing canopy toward the drive aisle exit. The canopy will be approximately 75 feet long and 10 feet wide. Alternate #1: Add a new canopy at the side Entry Canopy / ASP Doorway, L-shaped configuration, approximately 80¿ in length by 10¿ wide. ¿ Palmer Middle School: Design and install a new canopy system extending from the front entrance to the drive aisle, then continuing along the drive aisle for the full length of the student pick-up area. The canopy will be approximately 270 feet long; width varies ¿ please refer to the drawings.
¿Calificás como pequeña empresa? El tope de facturación o empleados para el NAICS 236220 lo define la SBA y cambia con el tiempo — lo más seguro es confirmarlo ahí, no acá. Verificar en sba.gov ↗
Empresas que ganaron awards con este mismo NAICS — datos públicos de USAspending, no una recomendación ni un dato oficial.
Creá tu cuenta para ver documentos con resumen, punto de contacto, guardar esta oportunidad en tu pipeline y recibir alertas antes del cierre.
Crear cuenta gratisGovBidder Connect no es una agencia gubernamental. Esta información se agrega de fuentes oficiales de dominio público y puede tener demoras o errores. Verificá los datos en la fuente oficial antes de actuar.