This project will rehabilitate approximately 2,698 linear feet of 24-inch concrete sewer using the Ultraviolet Cured-in-Place Pipe (UV CIPP) liner method. The proposed work will also include rehabilitating existing maintenance holes with Type I Liner, abandoning an existing offset maintenance hole, and upsizing existing 24-inch maintenance hole frame and covers to new 30-inch frame and covers. One (1) existing maintenance hole along the CBD Unit 15 alignment will not be upsized. The proposed work will also require performing sewer bypassing, traffic and odor control, and sewer cleaning. The project starts near the Hoover St & James M. Wood Blvd intersection; traverses through James M. Wood Blvd, Park View St, and 11th St; and ends at the Lake St & 11th St intersection. ▬ ● See bid package for full scope & details ●● Bid package only on RAMPLA- download Part 1 to be a planholder ● For planholders lists & bid results visit: http://engineering.lacity.gov/contractors/
¿Calificás como pequeña empresa? El tope de facturación o empleados para el NAICS 333924 lo define la SBA y cambia con el tiempo — lo más seguro es confirmarlo ahí, no acá. Verificar en sba.gov ↗
Empresas que ganaron awards con este mismo NAICS — datos públicos de USAspending, no una recomendación ni un dato oficial.
Creá tu cuenta para ver documentos con resumen, punto de contacto, guardar esta oportunidad en tu pipeline y recibir alertas antes del cierre.
Crear cuenta gratisGovBidder Connect no es una agencia gubernamental. Esta información se agrega de fuentes oficiales de dominio público y puede tener demoras o errores. Verificá los datos en la fuente oficial antes de actuar.