The scope of this project includes the replacement of seven (7) floating docks on the main dock walkway, marginal wharf and B-Dock, three (3) finger piers, electrical and mechanical utilities within the project area, and replacement of cable-connections within the floating dock to accommodate the removal of the wave attenuators.The floating docks will be replaced by five (5) 13-foot-wide floating docks along the walkway, and one (1) each 10-foot-wide floating dock, and three (3) 4-foot-wide by 45 foot-long finger pier in the orientation presented on the drawings. Due to damage from boat impact during hurricane Milton, two (2) new 8-foot-wide by 31-foot long aluminum gangways are to be installed at the existing platform and dock that is remaining. Also, new piles including pile guides as shown on the drawings will need to be installed to anchor the remaining portions of the marginal wharf.The work also includes replacing the water, fire and electrical lines that run along the dock from the marginal wharf through A-dock due to damage from the hurricane and replacement needed based on the removal and replacement of floating wave attenuators.
¿Calificás como pequeña empresa? El tope de facturación o empleados para el NAICS 237990 lo define la SBA y cambia con el tiempo — lo más seguro es confirmarlo ahí, no acá. Verificar en sba.gov ↗
Empresas que ganaron awards con este mismo NAICS — datos públicos de USAspending, no una recomendación ni un dato oficial.
Creá tu cuenta para ver documentos con resumen, punto de contacto, guardar esta oportunidad en tu pipeline y recibir alertas antes del cierre.
Crear cuenta gratisGovBidder Connect no es una agencia gubernamental. Esta información se agrega de fuentes oficiales de dominio público y puede tener demoras o errores. Verificá los datos en la fuente oficial antes de actuar.