Datos de fuentes oficiales de EE.UU. · Ver planes y precios →
← Volver a la búsqueda

Installation of Styrene-Butadiene-Styrene (SBS) Modified Bitumen Roofing System

ACTIVE

The New York City (the “City”) Department of Design and Construction (“DDC” or the “Department”) is in the process of establishing a pre-qualified list (“PQL”) of contractors for furnishing all labor, materials and equipment, necessary and required to install a Styrene-Butadiene-Styrene Modified Bitumen roofing system such as Siplast P2030, GAF SBS Ruberoid Heat Weld, or approved equal for various capital construction projects. It is anticipated that the estimated construction cost for these types of roof projects will range from $100,000 to $10,000,000.

N° de solicitud
Tipo de aviso
NAICS
PSC
Z1AZ — Maintenance Of Other Administrative Facilities And Service Buildings
Valor estimado (inferido, no oficial)
Set-aside
Lugar de ejecución
NY
Publicada
24 de abr de 2025
Cierre
31 de dic de 2099
Última actualización
Ver en la fuente oficial

Ver el detalle completo

Creá tu cuenta para ver documentos con resumen, punto de contacto, guardar esta oportunidad en tu pipeline y recibir alertas antes del cierre.

Crear cuenta gratis

GovBidder Connect no es una agencia gubernamental. Esta información se agrega de fuentes oficiales de dominio público y puede tener demoras o errores. Verificá los datos en la fuente oficial antes de actuar.