Datos de fuentes oficiales de EE.UU. · Ver planes y precios →
← Volver a la búsqueda

Central Millbrae Stormwater & Utility Improvements Project Laurel Avenue & Green Hills Drive

ACTIVE

In general, the work to be performed consists of but is not limited to, the removal and replacement of existing storm drains and installation of new storm drains in sizes 18-inch and 24-inch, using trench and open cut construction methods, storm drain manhole installations, pavement trench repairs, potholing, PCC curb, gutter, sidewalk removal and replacement, storm drain inlet replacement and new construction, incidental striping/markers removal & replacement, traffic control, mobilization, and all other work as shown on the Plans.

N° de solicitud
Tipo de aviso
Central Millbrae Stormwater & Utility Improvements Project Laurel Avenue & Green Hills Drive
NAICS
237110 — Water and Sewer Line and Related Structures Construction
PSC
Y1LB — Construction Of Highways, Roads, Streets, Bridges, And Railways
Valor estimado (inferido, no oficial)
$63,804 – $3,979,485 (8 awards similares)
Set-aside
Lugar de ejecución
CA
Publicada
28 de ago de 2026
Cierre
11 de sept de 2026
Última actualización

¿Calificás como pequeña empresa? El tope de facturación o empleados para el NAICS 237110 lo define la SBA y cambia con el tiempo — lo más seguro es confirmarlo ahí, no acá. Verificar en sba.gov ↗

Posibles socios para subcontratar

Empresas que ganaron awards con este mismo NAICS — datos públicos de USAspending, no una recomendación ni un dato oficial.

Ver en la fuente oficial

Ver el detalle completo

Creá tu cuenta para ver documentos con resumen, punto de contacto, guardar esta oportunidad en tu pipeline y recibir alertas antes del cierre.

Crear cuenta gratis

GovBidder Connect no es una agencia gubernamental. Esta información se agrega de fuentes oficiales de dominio público y puede tener demoras o errores. Verificá los datos en la fuente oficial antes de actuar.