NRCS - Construction Services for Stream Remediation and Stabilization

ACTIVE

The County is receiving funds from the Natural Resource Conservation Service (“NRCS”) Emergency Watershed Protection (“EWP”) Program. The County is releasing this ITB with the intent to receive bids from qualified contractors to provide construction services for eight (8) stream/canal remediation and stabilization sites in Hardee County. The detailed scope of work is provided below. The County is seeking to engage a qualified contractor to provide all labor, materials, equipment, supervision, and incidentals necessary to complete the stream and canal remediation and stabilization improvements in accordance with the ITB and awarded contract (collectively “Contract Documents”). 1. SCOPE There are eight (8) creek/canal systems in the vicinity of County maintained right-of-way within Hardee County that require remediation and stabilization. These sites are identified below and are depicted on the attached maps (EXHIBIT A). • Dansby Road and Troublesome Creek: Sod placement and debris removal (approximately 600-LF). • South Florida Avenue: Sod, debris removal (approximately 1,300-LF), and sediment removal. • Airport Road and Max Branch (Airport Rd I Ian): Debris removal (approximately 1,200- LF). • Airport Road and Drainage Channel (Airport Rd II Ian): Debris removal (approximately 1,800-LF). • Old Town Creek Road (Old Town Rd Ian): Debris removal (approximately 1,000-LF). • Hawaiian Drive: Riprap, debris removal (approximately 400-LF), excavation, and backfill (placed and compacted). • Circle Drive: Sod, riprap, geotextile, debris removal (approximately 650-LF), excavation, backfill (placed and compacted), and sheet pile (150-LF of wall with concrete caps). • Hanchey Road: Sod, riprap, geotextile, debris removal (approximately 400-LF), excavation, and backfill (placed and compacted). The contractor shall provide all labor, materials, equipment, supervision, mobilization, maintenance of traffic (if required), erosion and sediment control, and incidentals necessary to complete the work as shown in the Contract Documents. Work shall include, but is not limited to: a. Mobilization and Demobilization b. Debris removal and lawful disposal, including vegetative and storm-related debris c. Sediment removal and excavation as required d. Furnish and install sod in all areas disturbed by construction e. Furnish and install riprap and geotextile in accordance with the plans and specifications f. Furnish and install sheet piling and concrete caps at Circle Drive g. Backfilling and compaction as specified h. Site restoration to pre-construction grades where applicable i. Compliance with NRCS EWP requirements and applicable FDOT standards, whichever is more stringent j. Coordination with the County and applicable agencies during construction The contractor shall be responsible for verifying field conditions prior to construction and shall immediately notify the County of any discrepancies.

N° de solicitud
Tipo de aviso
ITB - Invitation to Bid
NAICS
237990 — Other Heavy and Civil Engineering Construction
PSC
Y1PZ — Construction Of Other Non-Building Facilities
Valor estimado (inferido, no oficial)
$1,572,585 – $4,919,262 (12 awards similares)
Set-aside
Lugar de ejecución
FL
Publicada
27 de ago de 2026
Cierre
25 de sept de 2026
Última actualización

¿Calificás como pequeña empresa? El tope de facturación o empleados para el NAICS 237990 lo define la SBA y cambia con el tiempo — lo más seguro es confirmarlo ahí, no acá. Verificar en sba.gov ↗

Posibles socios para subcontratar

Empresas que ganaron awards con este mismo NAICS — datos públicos de USAspending, no una recomendación ni un dato oficial.

Ver en la fuente oficial

Ver el detalle completo

Creá tu cuenta para ver documentos con resumen, punto de contacto, guardar esta oportunidad en tu pipeline y recibir alertas antes del cierre.

Crear cuenta gratis

GovBidder Connect no es una agencia gubernamental. Esta información se agrega de fuentes oficiales de dominio público y puede tener demoras o errores. Verificá los datos en la fuente oficial antes de actuar.