The Contractor shall provide all labor, supervision, materials, new equipment, permits, inspections, and technical expertisenecessary to remove existing components, including electrical connections where required, and furnish and install new fireprotection equipment. Contractor shall field verify all dimensions, existing conditions, piping arrangements, equipment locations,and system configurations prior to installation. The scope of work includes, but is not limited to, the items described herein. TheContractor shall deliver a complete and fully operational system, including all materials, fittings, couplings, supports, hangers, trim,and accessories required for a complete installation, whether specifically listed or not.
¿Calificás como pequeña empresa? El tope de facturación o empleados para el NAICS 238220 lo define la SBA y cambia con el tiempo — lo más seguro es confirmarlo ahí, no acá. Verificar en sba.gov ↗
Empresas que ganaron awards con este mismo NAICS — datos públicos de USAspending, no una recomendación ni un dato oficial.
Creá tu cuenta para ver documentos con resumen, punto de contacto, guardar esta oportunidad en tu pipeline y recibir alertas antes del cierre.
Crear cuenta gratisGovBidder Connect no es una agencia gubernamental. Esta información se agrega de fuentes oficiales de dominio público y puede tener demoras o errores. Verificá los datos en la fuente oficial antes de actuar.