Datos de fuentes oficiales de EE.UU. · Ver planes y precios →
← Volver a la búsqueda

Primary Clarifier #1 Rehabilitation Project

ACTIVE

The primary clarifiers were installed in 1998 and have reached the end of their useful life. The coating on the metal equipment has failed resulting is extensive corrosion of the carbon steel. The mechanical system is beyond repair, so this equipment must be removed and replaced. This project proposes to replace the mechanical equipment, replacement of the electrical control panel, and concrete/grout repairs, to restore proper operation and extend the units life as per the attached plans and specifications.

N° de solicitud
Tipo de aviso
Local Solicitation
NAICS
237110 — Water and Sewer Line and Related Structures Construction
PSC
Y1QA — Construction Of Restoration Of Real Property (Public Or Private)
Valor estimado (inferido, no oficial)
$63,804 – $3,979,485 (8 awards similares)
Set-aside
Lugar de ejecución
NM
Publicada
27 de ago de 2026
Cierre
30 de sept de 2026
Última actualización

¿Calificás como pequeña empresa? El tope de facturación o empleados para el NAICS 237110 lo define la SBA y cambia con el tiempo — lo más seguro es confirmarlo ahí, no acá. Verificar en sba.gov ↗

Posibles socios para subcontratar

Empresas que ganaron awards con este mismo NAICS — datos públicos de USAspending, no una recomendación ni un dato oficial.

Ver en la fuente oficial

Ver el detalle completo

Creá tu cuenta para ver documentos con resumen, punto de contacto, guardar esta oportunidad en tu pipeline y recibir alertas antes del cierre.

Crear cuenta gratis

GovBidder Connect no es una agencia gubernamental. Esta información se agrega de fuentes oficiales de dominio público y puede tener demoras o errores. Verificá los datos en la fuente oficial antes de actuar.