Datos de fuentes oficiales de EE.UU. · Ver planes y precios →
← Volver a la búsqueda

Zone 3 And 4 Pump Station Upgrades And Hillsborough Pump Station Electrical Upgrades

ACTIVE

The scope of work for this contract includes providing all necessary labor, supervision,materials, and equipment required to complete the work for both the Zone 3 and 4Pump Station Upgrades (Schedule A Drawings) and the Hillsborough Pump StationElectrical Upgrades (Schedule B Drawings).This is a potable water project. As such, all construction activities, materials, equipment,and components conveying or in contact with potable water must be in compliance withpertinent California potable water standards, NSF-61, and comply with all City ofNewport Beach requirements for potable water.Please see the special provisions for the full scope of services.

N° de solicitud
Tipo de aviso
ZONE 3 AND 4 PUMP STATION UPGRADES AND HILLSBOROUGH PUMP STATION ELECTRICAL UPGRADES
NAICS
237110 — Water and Sewer Line and Related Structures Construction
PSC
Valor estimado (inferido, no oficial)
$63,804 – $3,979,485 (8 awards similares)
Set-aside
Lugar de ejecución
CA
Publicada
26 de ago de 2026
Cierre
23 de sept de 2026
Última actualización

¿Calificás como pequeña empresa? El tope de facturación o empleados para el NAICS 237110 lo define la SBA y cambia con el tiempo — lo más seguro es confirmarlo ahí, no acá. Verificar en sba.gov ↗

Posibles socios para subcontratar

Empresas que ganaron awards con este mismo NAICS — datos públicos de USAspending, no una recomendación ni un dato oficial.

Ver en la fuente oficial

Ver el detalle completo

Creá tu cuenta para ver documentos con resumen, punto de contacto, guardar esta oportunidad en tu pipeline y recibir alertas antes del cierre.

Crear cuenta gratis

GovBidder Connect no es una agencia gubernamental. Esta información se agrega de fuentes oficiales de dominio público y puede tener demoras o errores. Verificá los datos en la fuente oficial antes de actuar.