The project is being bid as a single prime contract: (1) General Construction. The scope of the Lake Flower Apartments Infrastructure Upgrades project includes, but is not limited to, plumbing improvements, equipment replacement, and interior renovations within the occupied facility. Major project components include:• Replacement of deteriorated domestic water piping throughout the building, includinginstallation of a new water softener and backflow preventer.• Removal and disposal of the existing defunct solar water heater and replacement ofexisting domestic water heaters.• Selective demolition and restoration of affected kitchens, bathrooms, and otherareas required to complete plumbing upgrades.• Renovation of Unit 2H, including interior finishes, bathroom and kitchenupgrades, and replacement of fixtures, accessories, lighting, and related items.• Complete renovation of the Director’s Office restrooms. Because the building will remain occupied during construction, work will be phased tominimize disruption to residents and operations. The Contractor will coordinate finalphasing, access, and tenant transition procedures with the Owner and Architect aftercontract award. Business enterprises awarded an identical or substantially similar procurement contract within the past five years: None
¿Calificás como pequeña empresa? El tope de facturación o empleados para el NAICS 236220 lo define la SBA y cambia con el tiempo — lo más seguro es confirmarlo ahí, no acá. Verificar en sba.gov ↗
Empresas que ganaron awards con este mismo NAICS — datos públicos de USAspending, no una recomendación ni un dato oficial.
Creá tu cuenta para ver documentos con resumen, punto de contacto, guardar esta oportunidad en tu pipeline y recibir alertas antes del cierre.
Crear cuenta gratisGovBidder Connect no es una agencia gubernamental. Esta información se agrega de fuentes oficiales de dominio público y puede tener demoras o errores. Verificá los datos en la fuente oficial antes de actuar.