Datos de fuentes oficiales de EE.UU. · Ver planes y precios →
← Volver a la búsqueda

Aden Bridge Replacement

ACTIVE

Nebraska Public Power District (DISTRICT) intends to procure all planning, material coordination, schedule preparation, labor, supervision, materials, tools, apparatus, equipment, conveyances, mobilization, and demobilization as necessary to remove and dispose of the existing Aden Bridge, and construct in its place a new twin span concrete box culvert. The project is located west of Gothenburg, Nebraska, on the Gothenburg Canal owned by the DISTRICT. Access to the site is through private property. The scope of work covered is intended to be a “turnkey” installation by the CONTRACTOR. Details regarding this project can be found under the "Documents" tab.

N° de solicitud
Tipo de aviso
Request for Bid
NAICS
237310 — Highway, Street, and Bridge Construction
PSC
Y1LB — Construction Of Highways, Roads, Streets, Bridges, And Railways
Valor estimado (inferido, no oficial)
$1,184,350 – $50,000,000 (10 awards similares)
Set-aside
Lugar de ejecución
NE
Publicada
21 de ago de 2026
Cierre
15 de sept de 2026
Última actualización

¿Calificás como pequeña empresa? El tope de facturación o empleados para el NAICS 237310 lo define la SBA y cambia con el tiempo — lo más seguro es confirmarlo ahí, no acá. Verificar en sba.gov ↗

Posibles socios para subcontratar

Empresas que ganaron awards con este mismo NAICS — datos públicos de USAspending, no una recomendación ni un dato oficial.

Ver en la fuente oficial

Ver el detalle completo

Creá tu cuenta para ver documentos con resumen, punto de contacto, guardar esta oportunidad en tu pipeline y recibir alertas antes del cierre.

Crear cuenta gratis

GovBidder Connect no es una agencia gubernamental. Esta información se agrega de fuentes oficiales de dominio público y puede tener demoras o errores. Verificá los datos en la fuente oficial antes de actuar.