The Work includes the provision of all equipment, labor, materials, tools, services,transportation, permits, utilities, and all other items necessary to complete the construction ofthe following, as specified and shown in the Construction Documents:Reconstruction of the existing stairways adjacent to the Hacienda. Rebuild the stairs using newmaterials while maintaining the historic look and feel while complying with current codes. Flatstones will be used instead of uneven rocks, and the concrete faux “red carpets” will be set flushwith the stone treads. Consistent tread and riser dimensions will be created and the handrailswill be replaced.The permanent railings specified in the plans have an extended lead time. The contractor will berequired to provide and install temporary railing according to Appendix B and compliant withCalifornia Department of Industrial Relations Section 3214 and California Building Code Section1014, then return to the site to remove the temporary railings and install the permanent railingsas shown in the plans.
¿Calificás como pequeña empresa? El tope de facturación o empleados para el NAICS 238190 lo define la SBA y cambia con el tiempo — lo más seguro es confirmarlo ahí, no acá. Verificar en sba.gov ↗
Empresas que ganaron awards con este mismo NAICS — datos públicos de USAspending, no una recomendación ni un dato oficial.
Creá tu cuenta para ver documentos con resumen, punto de contacto, guardar esta oportunidad en tu pipeline y recibir alertas antes del cierre.
Crear cuenta gratisGovBidder Connect no es una agencia gubernamental. Esta información se agrega de fuentes oficiales de dominio público y puede tener demoras o errores. Verificá los datos en la fuente oficial antes de actuar.