Datos de fuentes oficiales de EE.UU. · Ver planes y precios →
← Volver a la búsqueda

SMART Overlay and Roadway Improvements in Braidwood: Pavement Patching, HMA Resurfacing, ADA Curb Ramps, Drainage Adjustments, Pavement Markings, and Signal Upgrades

ACTIVE

SMART Overlay up to the omission and Designed Overlay includes pavement patches hot-mix asphalt (HMA) surface removal, resurfacing with HMA binder and surface course, longitudinal joint sealing, curb and gutter removal and replacement, drainage structures adjustments and cleaning, new thermoplastic pavement markings, detector loops replacement, curb ramps for sidewalk (ADA) improvement installation of raised reflective pavement markers, and minor traffic signal improvements. The project is located within the City of Braidwood.

N° de solicitud
Tipo de aviso
Local Solicitation
NAICS
237310 — Highway, Street, and Bridge Construction
PSC
Y1LB — Construction Of Highways, Roads, Streets, Bridges, And Railways
Valor estimado (inferido, no oficial)
$1,184,350 – $50,000,000 (10 awards similares)
Set-aside
Lugar de ejecución
IL
Publicada
18 de ago de 2026
Cierre
18 de sept de 2026
Última actualización

¿Calificás como pequeña empresa? El tope de facturación o empleados para el NAICS 237310 lo define la SBA y cambia con el tiempo — lo más seguro es confirmarlo ahí, no acá. Verificar en sba.gov ↗

Posibles socios para subcontratar

Empresas que ganaron awards con este mismo NAICS — datos públicos de USAspending, no una recomendación ni un dato oficial.

Ver en la fuente oficial

Ver el detalle completo

Creá tu cuenta para ver documentos con resumen, punto de contacto, guardar esta oportunidad en tu pipeline y recibir alertas antes del cierre.

Crear cuenta gratis

GovBidder Connect no es una agencia gubernamental. Esta información se agrega de fuentes oficiales de dominio público y puede tener demoras o errores. Verificá los datos en la fuente oficial antes de actuar.