Datos de fuentes oficiales de EE.UU. · Ver planes y precios →
← Volver a la búsqueda

Spring Branch Trail Segment 04A From Chatterton Drive to north of Fullerton Drive

ACTIVE

Scope of work includes a 10-foot-wide concrete trail, subgrade stabilization, two mid-block crossings, four neighborhood connections, a 48" RCB crossing of a drainage ditch, and landscape amenities. Utility coordination with CenterPoint and Kinder Morgan will be required, including three crossings of an existing 36-inch Kinder Morgan pipeline.Estimate: Under 2,250,000

N° de solicitud
Tipo de aviso
Local Solicitation
NAICS
237310 — Highway, Street, and Bridge Construction
PSC
Y1LZ — Construction Of Parking Facilities
Valor estimado (inferido, no oficial)
$702,323 – $50,000,000 (12 awards similares)
Set-aside
Lugar de ejecución
TX
Publicada
15 de ago de 2026
Cierre
17 de sept de 2026
Última actualización

¿Calificás como pequeña empresa? El tope de facturación o empleados para el NAICS 237310 lo define la SBA y cambia con el tiempo — lo más seguro es confirmarlo ahí, no acá. Verificar en sba.gov ↗

Posibles socios para subcontratar

Empresas que ganaron awards con este mismo NAICS — datos públicos de USAspending, no una recomendación ni un dato oficial.

Ver en la fuente oficial

Ver el detalle completo

Creá tu cuenta para ver documentos con resumen, punto de contacto, guardar esta oportunidad en tu pipeline y recibir alertas antes del cierre.

Crear cuenta gratis

GovBidder Connect no es una agencia gubernamental. Esta información se agrega de fuentes oficiales de dominio público y puede tener demoras o errores. Verificá los datos en la fuente oficial antes de actuar.