In general, the Scope of Work includes beginning with the 80% design development documents, finalize construction documents by preparing drawings, plans, specifications and other documents setting forth, in detail, the requirements for construction of the Project; develop and submit all permitting, bidding, and construction documents for the Project; provide a project cost estimate based on final designs; and provide Construction Contract Administration (CA) services including, but not limited to, site visits, reports, submittal review, construction document interpretation, and cost/payment review. Initial 80% design drawings are attached to this solicitation. The successful offeror will receive the full CAD files. An environmental review is currently underway at this site which may take six to nine (6-9) months to complete. Plans may only be drafted to the 90% level before environmental review is finished. Once environmental clearance is received, a Notice to Proceed will be issued to allow for design work to be finalized.
¿Calificás como pequeña empresa? El tope de facturación o empleados para el NAICS 541310 lo define la SBA y cambia con el tiempo — lo más seguro es confirmarlo ahí, no acá. Verificar en sba.gov ↗
Empresas que ganaron awards con este mismo NAICS — datos públicos de USAspending, no una recomendación ni un dato oficial.
Creá tu cuenta para ver documentos con resumen, punto de contacto, guardar esta oportunidad en tu pipeline y recibir alertas antes del cierre.
Crear cuenta gratisGovBidder Connect no es una agencia gubernamental. Esta información se agrega de fuentes oficiales de dominio público y puede tener demoras o errores. Verificá los datos en la fuente oficial antes de actuar.