Dalton Utilities is soliciting bids for the design, fabrication, and delivery of electrical equipment for the J.D. Cope Energy Facility, a new 55.6 MW reciprocating-engine generation facility in Whitfield County, Georgia. The scope includes one 13.8 kV arc-resistant medium-voltage switchgear lineup and one 480 V arc-resistant low-voltage switchgear lineup, along with required engineering submittals, manufacturer field services, spare parts, special tools, and associated documentation. Please review the attachment for detailed specifications. The projected award date is September 16th, 2026, with a planned delivery date of November 26th, 2027. The Owner reserves the right to award the project to the Vendor whose bid is determined to be the best overall value for the Owner. This does not guarantee the award of the project to the lowest bidder.
¿Calificás como pequeña empresa? El tope de facturación o empleados para el NAICS 335313 lo define la SBA y cambia con el tiempo — lo más seguro es confirmarlo ahí, no acá. Verificar en sba.gov ↗
Empresas que ganaron awards con este mismo NAICS — datos públicos de USAspending, no una recomendación ni un dato oficial.
Creá tu cuenta para ver documentos con resumen, punto de contacto, guardar esta oportunidad en tu pipeline y recibir alertas antes del cierre.
Crear cuenta gratisGovBidder Connect no es una agencia gubernamental. Esta información se agrega de fuentes oficiales de dominio público y puede tener demoras o errores. Verificá los datos en la fuente oficial antes de actuar.