Datos de fuentes oficiales de EE.UU. · Ver planes y precios →
← Volver a la búsqueda

North Base Electric Vehicle (EV) Charging Project

ACTIVE

1. Installation of one (1) 3000A switchgear (provided by the Owner) to serve the existing ten (10) ABB chargers and dispensers, new chargers and dispensers for up to six (6) Electric Vehicles (EVs), and future EVs growth at the Agency's North Base Operation and Maintenance Facility in South San Francisco2. Installation of three (3) ChargePoint CP6000 Dual Port chargers, connection to PG&E’s new transformers, and necessary wiring and connections

N° de solicitud
Tipo de aviso
North Base Electric Vehicle (EV) Charging Project
NAICS
238210 — Electrical Contractors and Other Wiring Installation Contractors
PSC
Z1EB — Maintenance Of Maintenance Buildings
Valor estimado (inferido, no oficial)
$16,529 – $439,031 (25 awards similares)
Set-aside
Lugar de ejecución
CA
Publicada
13 de ago de 2026
Cierre
22 de sept de 2026
Última actualización

¿Calificás como pequeña empresa? El tope de facturación o empleados para el NAICS 238210 lo define la SBA y cambia con el tiempo — lo más seguro es confirmarlo ahí, no acá. Verificar en sba.gov ↗

Posibles socios para subcontratar

Empresas que ganaron awards con este mismo NAICS — datos públicos de USAspending, no una recomendación ni un dato oficial.

Ver en la fuente oficial

Ver el detalle completo

Creá tu cuenta para ver documentos con resumen, punto de contacto, guardar esta oportunidad en tu pipeline y recibir alertas antes del cierre.

Crear cuenta gratis

GovBidder Connect no es una agencia gubernamental. Esta información se agrega de fuentes oficiales de dominio público y puede tener demoras o errores. Verificá los datos en la fuente oficial antes de actuar.