Datos de fuentes oficiales de EE.UU. · Ver planes y precios →
← Volver a la búsqueda

Parker Canyon Lake Boating Facility

ACTIVE

This project consists of:  Constructing a new boating facility at Parker Canyon Lake per engineers plans in Exhibit 2 and special provisions in Exhibit 3. Clearing and grubbing, grading, paving, installation of a vault toilet, dock and gangway, and the construction of a concrete boat ramp This is NOT a Davis Bacon Wage project. This project must comply with Build America, Buy America Act (BABAA) requirements as required by Section 70914 of the Infrastructure Investment and Jobs Act (Pub. L. 117-58). BABAA requirement language is provided in Exhibit 1. Please note: work MAY NOT be performed between May 24 and Sept 30 due to breeding season restrictions Work anticipated to begin October 1, 2026

N° de solicitud
Tipo de aviso
IFB
NAICS
236220 — Commercial and Institutional Building Construction
PSC
Y1PZ — Construction Of Other Non-Building Facilities
Valor estimado (inferido, no oficial)
$268,735 – $18,469,853 (138 awards similares)
Set-aside
Lugar de ejecución
AZ
Publicada
12 de ago de 2026
Cierre
09 de sept de 2026
Última actualización

¿Calificás como pequeña empresa? El tope de facturación o empleados para el NAICS 236220 lo define la SBA y cambia con el tiempo — lo más seguro es confirmarlo ahí, no acá. Verificar en sba.gov ↗

Posibles socios para subcontratar

Empresas que ganaron awards con este mismo NAICS — datos públicos de USAspending, no una recomendación ni un dato oficial.

Ver en la fuente oficial

Ver el detalle completo

Creá tu cuenta para ver documentos con resumen, punto de contacto, guardar esta oportunidad en tu pipeline y recibir alertas antes del cierre.

Crear cuenta gratis

GovBidder Connect no es una agencia gubernamental. Esta información se agrega de fuentes oficiales de dominio público y puede tener demoras o errores. Verificá los datos en la fuente oficial antes de actuar.