Datos de fuentes oficiales de EE.UU. · Ver planes y precios →
← Volver a la búsqueda

Rehabilitation of Lift Station 13, 51, and 58

ACTIVE

Lift Station (LS) 13 includes furnishing and installing wet well and valve vault top slab and portions of side walls, access hatches with safety grate, magnetic flow meter and precast vault, natural gas generator with platform and concrete foundation, handrail, fencing, temporary and permanent electrical work, instrumentation and integration, site work, gravity sewer relocation, natural gas piping and coordination with Clearwater Gas (CGS Energy), maintaining wastewater flow, surface restoration, tree protection and trimming, grading, start-up and testing, and all appurtenant work needed for complete and operational systems, as indicated on the Drawings and as specified.Lift Station (LS) 51 includes furnishing and installing wet well treadplate, safety grates, magnetic flow meter and precast vault, natural gas generator and concrete pad, natural gas piping and coordination with Clearwater Gas (CGS Energy), temporary and permanent electrical work, instrumentation and integration, site work, water service and backflow relocation, maintaining wastewater flow, plug valve, fittings, surface restoration, new fence and gate, tree removal and trimming, start-up and testing, and all appurtenant work needed for complete and operational systems, as indicated on the Drawings and as specified.Lift Station (LS) 58 includes furnishing and installing pump base elbows, discharge piping and fittings, pump cable grating and treadplate, wet well and valve vault safety grates, bollards, instrumentation, site work, influent manhole ring and cover, odor control media replacement, flow control and bypass pumping, bypass connection testing, surface restoration, start-up and testing, and all appurtenant work needed for complete and operational systems, as indicated on the Drawings and as specified.The Contractor shall provide Fixed project signs as described in Section III, Section 23 of the Contract Documents. The final number of project signs will be determined at the beginning of the project based on the Contractor’s schedule of work submitted for approval. Additional project signs may be required at no additional cost to the city due to the Contractor’s schedule of work.Contract Period: 420 Consecutive Calendar Days

N° de solicitud
Tipo de aviso
Local Solicitation
NAICS
221320 — Sewage Treatment Facilities
PSC
Y1QA — Construction Of Restoration Of Real Property (Public Or Private)
Valor estimado (inferido, no oficial)
$90,442 – $443,980 (3 awards similares)
Set-aside
Lugar de ejecución
FL
Publicada
12 de ago de 2026
Cierre
30 de sept de 2026
Última actualización

¿Calificás como pequeña empresa? El tope de facturación o empleados para el NAICS 221320 lo define la SBA y cambia con el tiempo — lo más seguro es confirmarlo ahí, no acá. Verificar en sba.gov ↗

Posibles socios para subcontratar

Empresas que ganaron awards con este mismo NAICS — datos públicos de USAspending, no una recomendación ni un dato oficial.

Ver en la fuente oficial

Ver el detalle completo

Creá tu cuenta para ver documentos con resumen, punto de contacto, guardar esta oportunidad en tu pipeline y recibir alertas antes del cierre.

Crear cuenta gratis

GovBidder Connect no es una agencia gubernamental. Esta información se agrega de fuentes oficiales de dominio público y puede tener demoras o errores. Verificá los datos en la fuente oficial antes de actuar.