1. Furnish all labor, materials, equipment, supplies, transportation, and disposal as necessary to complete the construction of Pavement Repairs at Seaport Village in the City of San Diego, California. 2. The work shall include, but not be limited to:a. Prepare traffic control plans and traffic control devices including coordination with real estate and tenants regarding any closures, installation and maintenance of temporary BMPs, removal and disposal of existing asphalt concrete and concrete pavement, structural pavement patching, slurry seal application, uniform depth mill and asphalt inlay, saw cutting and removal of tree roots impacting pavement sections, repair of concrete curb and gutter, adjustment of utility frames and covers to grade including lowering and raising as required, removal and reset of existing bollards, removal and reset of parking bumpers, removal, protection, storage, and restoration of existing parking gate sensors and associated equipment, removal and reset of loop detectors, removal and reset of parking occupancy sensors, restoration of pavement striping and markings, and performance of all other ancillary work at the locations shown on the Plans.
¿Calificás como pequeña empresa? El tope de facturación o empleados para el NAICS 237310 lo define la SBA y cambia con el tiempo — lo más seguro es confirmarlo ahí, no acá. Verificar en sba.gov ↗
Empresas que ganaron awards con este mismo NAICS — datos públicos de USAspending, no una recomendación ni un dato oficial.
Creá tu cuenta para ver documentos con resumen, punto de contacto, guardar esta oportunidad en tu pipeline y recibir alertas antes del cierre.
Crear cuenta gratisGovBidder Connect no es una agencia gubernamental. Esta información se agrega de fuentes oficiales de dominio público y puede tener demoras o errores. Verificá los datos en la fuente oficial antes de actuar.