Datos de fuentes oficiales de EE.UU. · Ver planes y precios →
← Volver a la búsqueda

Sign and Delineator Maintenance, Repair, and Replacement on Primary Arterial and Interstate Roadways in Gadsden and Leon Counties

ACTIVE

LETTING LOCATION: 1074 HWY 90 Chipley POSTING DATES: 10/01/2026 and 10/15/2026 CONTRACT DAYS: CONTRACT EXECUTION DAYS: 10 SPECIAL START DATE: N/A ACQUIS./FLEXIBLE START TIME: 15 DAYS The work under this Work Document Driven Contract consists of removal, replacement, and repair of signs, sign structures and delineators, cleaning ground mounted and overhead sign panels along various primary arterial and interstate roadways in Gadsden and Leon Counties. The Budget Estimate for this project is $200,000.00. The Surety Bond/Performance Bond has been waived for this Proposal

N° de solicitud
Tipo de aviso
Local Solicitation
NAICS
237310 — Highway, Street, and Bridge Construction
PSC
Z1FB — Maintenance Of Recreational Buildings
Valor estimado (inferido, no oficial)
$702,323 – $50,000,000 (12 awards similares)
Set-aside
Lugar de ejecución
FL
Publicada
11 de ago de 2026
Cierre
10 de sept de 2026
Última actualización

¿Calificás como pequeña empresa? El tope de facturación o empleados para el NAICS 237310 lo define la SBA y cambia con el tiempo — lo más seguro es confirmarlo ahí, no acá. Verificar en sba.gov ↗

Posibles socios para subcontratar

Empresas que ganaron awards con este mismo NAICS — datos públicos de USAspending, no una recomendación ni un dato oficial.

Ver en la fuente oficial

Ver el detalle completo

Creá tu cuenta para ver documentos con resumen, punto de contacto, guardar esta oportunidad en tu pipeline y recibir alertas antes del cierre.

Crear cuenta gratis

GovBidder Connect no es una agencia gubernamental. Esta información se agrega de fuentes oficiales de dominio público y puede tener demoras o errores. Verificá los datos en la fuente oficial antes de actuar.