Datos de fuentes oficiales de EE.UU. · Ver planes y precios →
← Volver a la búsqueda

Town of Suffield - New Sidewalk along Mapleton Avenue

ACTIVE

The project involves the construction of approximately 2,200 feet of concrete sidewalks along with drainage improvements and two retaining walls. Sidewalk construction includes: driveway paving as required for areas disturbed by work. Drainage work includes: installation of one catch basin, 1 pipe end and 50 feet of storm drain pipe. Retaining wall includes an approximately 150 feet long by 2.5 feet high retaining wall with a chain link fence within the right of way and removal and replacement of a retaining wall for a driveway turnaround on property of 400 Mapleton Avenue.

N° de solicitud
Tipo de aviso
ITB
NAICS
238110 — Poured Concrete Foundation and Structure Contractors
PSC
Y1LZ — Construction Of Parking Facilities
Valor estimado (inferido, no oficial)
Set-aside
Lugar de ejecución
CT
Publicada
11 de ago de 2026
Cierre
08 de sept de 2026
Última actualización

¿Calificás como pequeña empresa? El tope de facturación o empleados para el NAICS 238110 lo define la SBA y cambia con el tiempo — lo más seguro es confirmarlo ahí, no acá. Verificar en sba.gov ↗

Posibles socios para subcontratar

Empresas que ganaron awards con este mismo NAICS — datos públicos de USAspending, no una recomendación ni un dato oficial.

Ver en la fuente oficial

Ver el detalle completo

Creá tu cuenta para ver documentos con resumen, punto de contacto, guardar esta oportunidad en tu pipeline y recibir alertas antes del cierre.

Crear cuenta gratis

GovBidder Connect no es una agencia gubernamental. Esta información se agrega de fuentes oficiales de dominio público y puede tener demoras o errores. Verificá los datos en la fuente oficial antes de actuar.